Public Realm Action Plan · Progress 2026

Building a downtown for people.

Since the release of its Public Realm Action Plan in 2021, Downtown Brooklyn Partnership has put into motion a number of projects that have turned pavement into places — plazas, parks, shared streets, and streetscapes that put people first. Take a walk with us to see what has been achieved, what changed, and what is coming next.

Scroll to follow the route

Downtown Brooklyn is the heart of the borough.

10002004
25002024
New Residents
18002004
37802024
New Homes
3002004
15002024
New Jobs

There has been unprecedented growth since 2004.

While the neighborhood has grown vertically, its public spaces have not kept pace with the demands of new development.

Downtown Brooklyn’s streets and open spaces hadn’t been substantially upgraded since the post-war era, even as the neighborhood grew and the standards for great public space changed. Walkability, bikeability, pedestrianization, and multimodal connectivity now inform what a downtown should embody. We are now transforming parking spaces into public space.

In 2018, Downtown Brooklyn Partnership worked with WXY and BIG to develop a long-term action plan that met emerging challenges with strategic opportunities.

The resulting Downtown Brooklyn Public Realm Action Plan, released in 2021, outlined a series of strategic interventions designed to create a streetscape that meets the needs of a modern, dynamic downtown.

An Action Plan calls for action. Since 2021, these projects have moved from paper to pavement.

The need was not only fueled by explosive growth.

Then

Streets and open spaces from the post-war era, not upgraded since.

  • Narrow sidewalks
  • Little tree cover
  • Few pedestrian amenities
  • Few parks
  • Little seating

The thinking around what a downtown could be had changed.

Now

New standards for making a great downtown.

  • Walkability
  • Bikeability
  • Pedestrianization
  • Multimodal connectivity
  • Streetscape
  • Sustainability
  • Open space
Video placeholder

On the ground, the pace is constant.

Growth increased the need. Outdated streets, sidewalks, and open space made the case.

Foundational work — proof of concept

More than a decade ago, two plazas served as the proof of concept: early tests of car-free public space in a growing downtown with new needs for it.

→
Proof of concept

Albee Square

One of Brooklyn’s original gathering spaces, expanded with the de-mapping of DeKalb Ave. An early proof-of-concept for a car-free pedestrian space.

BEFORE AFTER
→
Proof of Concept

Willoughby Plaza

A pedestrian plaza carved out of former roadway, long before “public realm” was part of the district’s vocabulary.

BEFORE AFTER
Now viewing Albee Square

Completed

Distinct projects, multiple partners, one direction: more green; more space to gather; streetscapes that invite one to stay awhile.

→
Streetscape

Fulton Mall Revitalization Project

A full reimagining of Brooklyn’s famous retail corridor — curvilinear, permeable paving, expanded planting beds, and inviting street furniture designed to attract visitors to shop and stay a while.

$8M
public investment
XX
sf of additional permeable surface
XX
sf of additional planting beds
XX
additional benches
→
New Park

Abolitionist Place

A 1.4-acre park at the center of Downtown Brooklyn — now the district’s flagship public space, and a home for programming, relaxation, and everyday public life.

1.4
acres of park
XX
annual visitors
→
Streets

Shared Streets

Slower streets where people and vehicles share the right of way — prioritizing pedestrian movement without redesigning the curb itself, and providing a canvas for public art.

XX
blocks converted
XX
sf of expanded pedestrian space

Bridge Street Shared Street

BEFORE AFTER
→
Partnerships

Public Realm Toolkit in Action

New development brings the opportunity for new public space that goes above and beyond the norm. 11 Hoyt, The Alloy Block, and The Brook each incorporated elements of DBP’s Public Realm Toolkit, including widened sidewalks, new planting beds, wooden benches, and permeable paving, to create more inviting, pedestrian-friendly environments.

11 Hoyt

BEFORE AFTER

The Alloy Block

BEFORE AFTER

The Brook

BEFORE AFTER
Now viewing Fulton Mall Revitalization Project

Sustainability goals

GREENING GOAL

1,000+

new trees planned district-wide to improve air quality and reduce urban heat island effect

TREE CANOPY

4 miles

of new planting closing gaps in the district's tree network

STORMWATER

230%

increase in surface permeability across the study area

In the works

The next stretch of the route is already taking shape — from a foundational civic space about to be reborn, to a new chapter for Grove Alley and expanded ped space for Temple Square.

→
Placeholder

Adams Street Redesign

Content to follow.

→

Fleet Street + Albee Square

Expanded gathering space around the historic Dime Savings Bank building — tree-filled, signature seating, inviting everyday public life at the heart of Downtown Brooklyn.

→

Grove Alley

Content to follow

→

Temple Square

Content to follow.

Now viewing Adams Street Redesign

Bold Brooklyn

Together, these efforts shape what's next and set the stage for the future.

→
Long-term vision

Columbus Park Reimagined

Eight acres of city-owned open space at the border of Downtown Brooklyn and Brooklyn Heights, underused for decades. Since 2024, DBP has partnered with Brooklyn Borough President Antonio Reynoso and Council Member Lincoln Restler — engaging WXY Studio and Michael Van Valkenburgh Associates on a community-driven vision unveiled in 2025.

Now viewing Columbus Park Reimagined

Explore the full map

Every plaza, streetscape, and shared street from the Action Plan, laid out in one place — zoom in to see how it all connects.

Map of Downtown Brooklyn and surrounding streets, parks and bike routes The same map with past, recently completed and future public realm projects marked Draft map from WXY deck — interactive version to come